Skip to the article content

AS-BUILT HANDOVER CHECKLIST

Before you start

The As-built handover checklist outlines the requirements that must be included in your as-built designs. You should refer to this checklist before you complete and submit your as-built designs as part of the Notice of Practical Completion (PCN).

The checklist

Download the checklist here.

As-built Handover Checklist

Download (PDF - 550 KB)

Completed the checklist?

If you have completed the checklist and you are ready, submit your as-built designs to us for review.