We’re providing end users and retail service providers the option to request extensions of the nbn network to an Approved Non-Premises Location.
Once an extension is built and the Approved Non-Premises Location becomes serviceable, retail service providers will be able to order and receive an nbn® Ethernet service at that location (subject to the limitations set out in the Approved Non-Premises List).
Traffic and Transport Infrastructure | Traffic Light + Traffic Control Unit (TCU) |
Traffic Cameras (Traffic Monitoring) |
|
Traffic Light + CCTV |
|
Traffic Signalling (Lane Markers) |
|
Roadside Emergency Comm's |
|
Traffic Cameras (Speed or Red-light Camera) |
|
Variable Speed Sign with CCTV |
|
Variable Speed Sign with Speed Indicator |
|
Tram Stop Electronic Signage (Time Table) |
|
Train Stop Electronic Signage (Time Table) |
|
Train Line Boom Gates |
|
Bus Stop Electronic Signage (Time Table) |
|
Road Swing Bridges Control |
|
Road Bridge Controls (Guidance Lights) |
|
Railway Station Infrastructure Communications (Public) |
|
CCTV (E.g. Safety Surveillance) |
|
Street Light Controllers |
|
Standalone ATM terminals | |
Standalone ATMs | |
Environmental Infrastructure |
Weather monitoring (Weather Stations) |
Air Quality (Monitoring) |
|
Fire Risk Area Monitoring (E.g. Bushfire) |
|
Fire Risk Area Monitoring + CCTV (E.g. Bushfire) |
Applying for an nbn® Network Extension
Our application process determines if a non-premises location and its use case qualifies to connect to the nbn network and lets you know of the nbn® Ethernet service you can order once the nbn Network Extension is in place. We will usually require up to 10 business days to assess the feasibility of each application and supply a design and construction quotation – each quotation we supply is tailored to the unique needs of each approved non-premises location.
The following information is required to apply: